Knowledge Management Portal Center Of Excellence

Center of Excellence

Kavach

Knowledge Management Portal

Download Kavach Chatbot


S No. Documents Description Date
1.
Video - Kavach Field PoC - Two Train on same Track - Head-on Collision Prevention
11/10/2012
2.
Video - Kavach Field PoC - Demo to CRB Media Address
16/10/2012
3.
TCAS Kavach 18.10.2012 Spad Prev Goods Stopping 3M Poc Field Concept Trials
18/10/2012
4.
Video - Kavach Core R&D Sample
01/10/2013
5.
Video - Kavach Core R&D Continuous Update Delayed Clearance
01/10/2013
6.
Video - Kavach Core R&D Multi-vendor Interoperability - Kernex Loco at Medha Stn
01/10/2013
7.
Video - Kavach Core R&D SPAD Prev Sample
08/02/2014
8.
Video - Kavach Core R&D SPAD Prevention 4000 T Goods Train on Down Grad Kurgunta on 11.02.2014
11/02/2014
9.
Video - Kavach Testing in Field through Simulator
25/03/2014
10.
Video - Kavach Core R&D - Coasting Based Braking
26/03/2014
11.
Video - Kavach Core R&D - LC Gate Approach Horn Whistling
27/03/2014
12.
Video - Kavach Core R&D SoS from Station
27/03/2014
13.
Video - Station Kavach Hardware Type Testing Lab
04/11/2014
13.
Video - Kavach Core R&D 2013-14 Part Field Concept Trials
12/12/2014
14.
Video - Kavach in Auto Sig without Stn-to-Stn OFC, without RF Tower in Block Section
25/11/2015
15.
Video - In house Demo of Kavach to Honorable Prime Minister(PM)
Oct 2016
16.
Video - Kavach trial conducted in the presence of Honourable Shri Ashwini Vaishnaw, Minister of Railways
04/03/2022
17.
Kavach Distance Margin for rear end collision avoidance -Stopping Distance Margin to be brought from 300m to less than Overlap
26/08/2022
18.
List of Stationary and Onboard Kavach documents
29/08/2022
19.
Format for RSSI/RF survey of transmission by Skavach
30/08/2022
20.
Confirmation about permanent locking of RFID Data before final testing for commissioning
05/09/2022
21.
Confirmation about development of practice of involvement of Railway Personnel in case of failures
19/09/2022
22.
Verification of Firmware Version Number of RFID Reading Unit: Wrong detection of direction incident due to firmware with old, commercial version
23/09/2022
23.
Verification of Gradient Data CoE Advice 1810.22 after noticing 1 in 150 Up Grad in doc instead of 1 in 150
18/10/2022
24.
Need for augmentation in EMU BIU to inhibit auto restoration of Traction
31/10/2022
25.
Optimization of Kavach braking logics and paraneter setting through field trials
31/10/2022
26.
Comments to ER on Sample RFID Tag TIN Layout
02/11/2022
27.
EI Interface and Resolving Existing Anomalies in IRISET Kavach Lab
15/12/2022
28.
Kavach - Unwarrangted reading of RFID tags of vicinity track by Medha
04/01/2023
29.
Need to ensure record updating with replacement of modules
06/01/2023
30.
Reckoning of Overlap Track while Assessing Movement Authority
20/01/2023
31.
Mismatch / non-sync between Conventional Lineside Signalling Arrangement and Kavach: Commissioining of Kavach along with new Installations
31/01/2023
32.
Video - Honorable Minister of Railways (MR) visit to Kavach Lab/IRISET/COE
04/02/2023
33.
Testing of Medha FRID reader with updated firmware in Locomotives
21/02/2023
34.
Higher info rate QAM Radio Modem for Kavach on Mcomm
04/03/2023
35.
Possibility of Incorrect detection of Emergency Exhaust Cut out cock in three phase Locomotives and three phase EMUs
06/03/2023
36.
Dissimilarity in three phase locomotive interface circuits across different OEMs and need of additional features
06/03/2023
37.
Optimization of Braking Logics of Kavach
12/04/2023
38.
Joint Note CoE RDSO - Frequency Planning Requrement in Ver 4 - SCR - Mission Raftaar - Kolkata-Delhi-Mumbai Ongoing Works
21/04/2023
39.
IRISET CoE Ltr 20230512 - Freq Ch Timeslot - Kavach on mComm
12/05/2023
40.
Kavach TCAS : Post Installation Radio Survey of Section: Testing at Site
19/05/2023
41.
Use of Onboard Simulator for testing Station Installation
19/05/2023
42.
Kavach (TCAS) Towers Google Earth Mapping and Residual Items Kolkata Delhi Mumbai Mission Raftaar Sec
21/05/2023
43.
COE comments on Pre-commissioning check list for SKAVACH and RIU as per RDSO/ SPN/196/2020 Ver 4.0
24/05/2023
44.
Spectrum sought by Zonal Railways through WPC Applications Frequency Planning for Kavach using mComm for Kolkata-Delhi-Mumbai Mission Raftaar Section SCR Ver 4
27/05/2023
45.
Difference in Brake Application Time and Brake Release Time With CCB 2.0 BIU
03/06/2023
46.
Finalisation of PCSTE Sanction Checklist for commissioning of Kavach - Seeking Comments from Zonal Rlys
08/06/2023
47.
Delay in BP dropping during application brakes through Kavach BIU in Loco 22592
09/06/2023
48.
Kavach Mission Raftaar Commissioning Ver 4 Ver 3 2
09/06/2023
49.
Drawings with respect to Kavach Fitment Scheme in WAP-7, WAG-9 locomotives rolling out from Pus
22/06/2023
50.
COE Comments on Pre-commissioning check list for Brake Interface Unit (E-70 Brake System)
27/06/2023
51.
IRISET CoE Ltr 20230704 Response to Clarifications sought by WCR
04/07/2023
52.
Letter to CLW with regard to Kavach Drawings 20230706
06/07/2023
53.
Kavach WCR Universal Solution 20230720 to Undue Release of Brake Joint Note WCR CoE Signed
20/07/2023
54.
CoE Ltr 20230724 Kavach Safety Procedure JPO SPAD Prev Other Tests
24/07/2023
55.
CoE IRISET 20230724 Speeds used in Field Trials SPAD Prevention and other Tests
24/07/2023
56.
CoE IRISET Ltr 20230725 Kavach Observations on Medha Loco Simulator at Site for Testing Stn Kavach
25/07/2023
57.
CoE Ltr 20230731 to RDSO Comments Loco TCAS Checklist PCCL
31/07/2023
58.
CoE Ltr 20230108 Kavach Comprehensive Protocol for Loco Trials
31/07/2023
59.
Max. number of Onboard Kavach Units Kavach TCAS CoE RDSO Joint Ltr 20230731
31/07/2023
60.
CoE Ltr 20230731 to OEMs copy RDSO Zonal Rlys - Conflicting Tag Issue
01/08/2023
61.
COE IRISET Ltr 20230803 Standard Drawings for Kavach Fitment WAP7 WAG9 WAP5
03/08/2023
62.
CoE IRISET Ltr 20230806 - Kavach - SPAD Prev Test at WCR Overshoot 130 110 kmph on 20230727
06/08/2023
63.
Kavach TCAS Insp MTJ PWL 20230815 - Insp Note 20230828 by OSD-CoE Lalit Mansukhani
15/08/2023
64.
IRISET COE Letter Kavach fitment in 3ph Locomotives 20230823
23/08/2023
65.
Kavach - Joint RDSO CoE Procedure 20230911 - Migration to Ver 4 in Mission Raftaar Section
11/09/2023
66.
IRISET COE Letter E70 Interface Drawing 20230912
12/09/2023
67.
CoE IRISET Ltr 20230920 - Kavach - Improper Braking Logic Parameters
20/09/2023
68.
IRISET Letter to SCR for Comments on 9000HP Interfacing Schematic 20230922
22/09/2023
69.
Letter to CLW for Cable Layout and routing Standardization with Annex 20230925
25/09/2023
70.
Joint Note for Adoption of Knorr Bremse CCB for Kavach 20231004
25/09/2023
71.
CoE Letter to Medha IRAB BIU with Annexures 20231003
03/10/2023
72.
IRISET CoE Ltr to Knorr_bremse wrt to comments on Technical Proposal 20231004
04/10/2023
73.
IRISET CoE Lr.toSCR wrt EMU trial 20231006
06/10/2023
74.
CoE Letter to RDSO for approval of EMU drawings 20231018
18/10/2023
75.
CoE Letter on Analysis of NCR SPAD tests 20231020
18/10/2023
76.
CoE Letter to RDSO installation drawings EMU 20231101
01/11/2023
77.
CoE IRISET Ltr 20231107 Use of 6mm & other size Choke - Case Study Investigation Loco 22592
07/11/2023
78.
Revised CCB 2.0 Test Specification 20231122
22/11/2023
79.
CoE letter sharing Presentation of 26th Nov2023 20231127
27/11/2023
80.
CoE Ltr to Kernex 20231127 undue increase of MA
27/11/2023
81.
CoE Ltr. Use of two tags of same RFID tag set for direction 20231214
14/12/2023
82.
CoE Ltr. Implementation of Health Monitoring and Alerts 20231215
15/12/2023
83.
CoE Ltr. Trial for Braking paramater configuartion in WR and NCR 20231216
16/12/2023
84.
CoE Ltr. Overlapping Communication zone of stationary Kavach units 20231217
17/12/2023
85.
CoE IRISET Ltr 20231218 - Software Logic Issue Resulting in Train Getting linked to Next Signal Uns
18/12/2023
86.
CoE IRISET Ltr 20231218 - Kavach Early Transition to LS mode within 10 Sec
18/12/2023
87.
CoE Kavach Ltr 20231220 to SCR OEMs- Standardization of Pneumatic Cocks Nomenclature
20/12/2023
88.
CoE Kavach Ltr 20231220 - Approval Functionally Different Time Products Different Makes
20/12/2023
89.
CoE Ltr Circulation of Kavach Interfacing E-70 Scheme to OEMs and Zonal Railways 20231226
26/12/2023
90.
CoE IRISET Ltr 20231228 - Kavach Stations with Same Duplicate IDs KMS-1
28/12/2023
91.
CoE IRISET Ltr 20231228 - Undue SoS Conflicting Tag Turnout en-route
28/12/2023
92.
RDSO Approval for conventional MEMU_underslung MEMU and 3 phase MEMU 20231229
29/12/2023
93.
CoE Letter MEMU Kavach Installation Drawings 20231229
29/12/2023
94.
CoE IRISET Ltr 20231231 - Movement Authority MA Approach Locking Section
31/12/2023
95.
CoE IRISET Ltr 20231231 - Option Switching Off Signal Aspect DMI OCIP - Use HR HHR DR Instead of ECR
31/12/2023
96.
Video - Primitive Demo of Automatic Train Operation function in field
27/01/2024
97.
CoE Ltr 20240129 - Moving Block Kavach - Auto Traction - Experiment FIeld Concept Trials OEM GG Tronic
29/01/2024
98.
CoE Lr. to RDSO wrt Draft Maintenance Activities of 3PhOnboard Kavach with Annexures 20240131
31/01/2024
99.
kavach-frame offset field in the radio packet structure dated on 31.01.2024
31/01/2024
100.
TSRMS n COA INTEGRATION LETTER TO CRIS 02.02.24
02/02/2024
101.
CoE Ltr 20240204 - Kavach - Mismatch in SIP of Station Block Section Affecting Kavach ToC
04/02/2024
102.
CoE Ltr 20240205 - Kavach - ToC MA - RDSO to issue Modification in Annexure-I Annexure-J in SRS
05/02/2024
103.
Letter to RDSO wrt Roll Away Protection Detection in Conventional EMU with Annexures 20240214
14/02/2024
104.
CoE Ltr to RDSO 20240312 - Reminder to RDSO - Uniform Braking Logic
12/03/2024
105.
CoE Ltr 20240312 to KBIL RDSO - Examination Clarification on Technical Description CCB BIU Doc
12/03/2024
106.
Kavach 20240314 - Solution Analysis Delay in BC Build Up Simultaneous Appl SA9 and A9 in IRAB
14/03/2024
107.
WAG 7 Kavach Installation Drawings with Covering Ltr 20240329
29/03/2024
108.
CoE Ltr 20240104 - Kavach - Proforma for Onboard Startup Procedure
01/04/2024
109.
Arrangement of KAVACH (IRATP) interfacing with CCB 2.0 Brake System in Three Phase Electric Locomotive 20240401
01/04/2024
110.
TSD related to Kavach 01.04.24
01/04/2024
111.
Centralized payment for Royalty charges for DPWCS, Kavach TCAS & VHF
19/04/2024
112.
CoE Ltr 20240425 to PS&EMU RDSO Revision in EMU Dwg (2)
25/04/2024
113.
CoE Ltr 20240425 - WAG 7 drawing Standardization with Annexures
25/04/2024
114.
CoE Ltr 20240425 to RDSO for Standard Electrical Interfacing Schematic CCB 2.0 with Annexures
25/04/2024
115.
CoE Ltr 20240509 - Kavach - Undue relaxation of Permitted Speed
09/05/2024
116.
CoE Ltr Kavach - Improper Implementation of Interfacing Scheme E-70 Brake by HBL 20240523
23/05/2024
117.
CoE Ltr - to Kavach OEMs RDSO wrt Onboard Non-Uniformity Procedure Arrangements Functions 20240524
24/05/2024
118.
CoE - Notes of Onboard Kavach Workshop at CoE-IRISET on 20240605 20240606 with CELEs OEMs RDSO PUs Work
12/06/2024
119.
CoE Ltr 20240618 - Kavach - Vande Bharat VB TCMS Slip Slide Reduced Braking Effort
18/06/2024
120.
v3- MoM Kavach Uniform Braking Algorithm Held at CoE on 20240621
25/06/2024
121.
CoE - Kavach - Note 20240703 of Insp 20240612 ECR AUBR-DEO Anugrah Narayan -Dev Deo Road
03/07/2024
122.
CoE - Loco Pilot Operating Manual for Kavach Spec Ver 3.2 - for comments
22/07/2024
123.
Kavach Spec Ver 3.2 Loco Pilot LP Optg Operating Manual Issue 2.0
10/09/2024
124.
CoE Ltr 20240917 to RDSO OEMs - Kavach Uniform Braking Algorithm Field Trials
17/09/2024
125.
CoE Ltr 20240918 - Kavach Course Module S&T Technicians Zonal Training School
18/09/2024
126.
CoE Ltr 20240918 - OEM-Specific - Uniform Braking Algorithm Status- Draft Algorithm
18/09/2024
127.
CoE Letter RDSO wrt to E70 and CCB 2.0 Interfacing 20240919
19/09/2024
128.
Video - Kavach-EI Interface 2022
129.
WR PED CoE Kavach Insp Note ADI-BRC 20241010 20241012
22/10/2024
130.
CoE Ltr 20241024 RDSO wrt to E-70 and CCB 2.0 Interfacing
24/10/2024
131.
Letter to CoE IRISET & ZRs for provisional approval of layouts for WAG-5 locos
30/10/2024
132.
CoE Ltr 20241101 to RDSO Kavach Onboard PCCL Modifications A
01/11/2024
133.
CoE - Kavach Training Material for Traffic Staff - for comments
26/12/2024
134.
Video - Kavach with First ever combination of WAG-9(LE-MU) and CCB in field on 28/12/2024
28/12/2024
135.
Video - on Onboard Kavach Installation in Electric Locomotives of IR
03/01/2025
136.
CoE Ltr to RDSO on Kavach Interfacing scheme in Three Phase EMU 20250109
09/01/2025
137.
E-70_CCB_Interfacing_Arrangement_Kavach_Brake system_Alt 20250326
13/03/2025
138.
CoE ltr to RDSO dated 20250327 on Arrangement of Kavach interfacing scheme in 3 phase EMUs
27/03/2025
139.
CoE Letter on KAVACH Interface with Electric Locomotives (MPCS) to RDSO 20250327
27/03/2025
140.
CoE letter on Automatic restoration of traction in Vande Bharat dated 20250408
07/04/2025
141.
CoE Ltr to RDSO HHP Loco Brake interfacing 20250415
15/04/2025
142.
Kavach Troubleshooting Directory for 3-Phase Locomotives equipped with Kavach (E-70 & CCB) dtd 20250422
22/04/2025
143.
Signed CoE letter regarding WAG7 with Arno Kavach Equipment Layout Non-Crew Friendly-Model_20250425
25/04/2025
144.
Signed MoM with ICF along with annexure 20250506
06/05/2025
145.
Video - on Introduction of Kavach (An Indigenous Automatic Train Protection System)
14/05/2025