Knowledge Management Portal Center Of Excellence

Center of Excellence

Knowledge Management Portal



S No. Documents Description Date
1.
Kavach - TCAS SPAD Prevention 4000 T Goods Train on Down Grad Kurgunta on 11.02.2014
11/02/2014
2.
Kavach Distance Margin for rear end collision avoidance -Stopping Distance Margin to be brought from 300m to less than Overlap
26/08/2022
3.
List of Stationary and Onboard Kavach documents
29/08/2022
4.
Format for RSSI/RF survey of transmission by Skavach
30/08/2022
5.
Confirmation about permanent locking of RFID Data before final testing for commissioning
05/09/2022
6.
Confirmation about development of practice of involvement of Railway Personnel in case of failures
19/09/2022
7.
Verification of Firmware Version Number of RFID Reading Unit: Wrong detection of direction incident due to firmware with old, commercial version
23/09/2022
8.
Verification of Gradient Data CoE Advice 1810.22 after noticing 1 in 150 Up Grad in doc instead of 1 in 150
18/10/2022
9.
Need for augmentation in EMU BIU to inhibit auto restoration of Traction
31/10/2022
10.
Optimization of Kavach braking logics and paraneter setting through field trials
31/10/2022
11.
Comments to ER on Sample RFID Tag TIN Layout
02/11/2022
12.
EI Interface and Resolving Existing Anomalies in IRISET Kavach Lab
15/12/2022
13.
Kavach - Unwarrangted reading of RFID tags of vicinity track by Medha
04/01/2023
14.
Need to ensure record updating with replacement of modules
06/01/2023
15.
Reckoning of Overlap Track while Assessing Movement Authority
20/01/2023
16.
Mismatch / non-sync between Conventional Lineside Signalling Arrangement and Kavach: Commissioining of Kavach along with new Installations
31/01/2023
17.
Testing of Medha FRID reader with updated firmware in Locomotives
21/02/2023
18.
Higher info rate QAM Radio Modem for Kavach on Mcomm
04/03/2023
19.
Possibility of Incorrect detection of Emergency Exhaust Cut out cock in three phase Locomotives and three phase EMUs
06/03/2023
20.
Dissimilarity in three phase locomotive interface circuits across different OEMs and need of additional features
06/03/2023
21.
Optimization of Braking Logics of Kavach
12/04/2023
22.
Joint Note CoE RDSO - Frequency Planning Requrement in Ver 4 - SCR - Mission Raftaar - Kolkata-Delhi-Mumbai Ongoing Works
21/04/2023
23.
IRISET CoE Ltr 20230512 - Freq Ch Timeslot - Kavach on mComm
12/05/2023
24.
Kavach TCAS : Post Installation Radio Survey of Section: Testing at Site
19/05/2023
25.
Use of Onboard Simulator for testing Station Installation
19/05/2023
26.
Kavach (TCAS) Towers Google Earth Mapping and Residual Items Kolkata Delhi Mumbai Mission Raftaar Sec
21/05/2023
27.
COE comments on Pre-commissioning check list for SKAVACH and RIU as per RDSO/ SPN/196/2020 Ver 4.0
24/05/2023
28.
Spectrum sought by Zonal Railways through WPC Applications Frequency Planning for Kavach using mComm for Kolkata-Delhi-Mumbai Mission Raftaar Section SCR Ver 4
27/05/2023
29.
Difference in Brake Application Time and Brake Release Time With CCB 2.0 BIU
03/06/2023
30.
Finalisation of PCSTE Sanction Checklist for commissioning of Kavach - Seeking Comments from Zonal Rlys
08/06/2023
31.
Delay in BP dropping during application brakes through Kavach BIU in Loco 22592
09/06/2023
32.
Kavach Mission Raftaar Commissioning Ver 4 Ver 3 2
09/06/2023
33.
Drawings with respect to Kavach Fitment Scheme in WAP-7, WAG-9 locomotives rolling out from Pus
22/06/2023
34.
COE Comments on Pre-commissioning check list for Brake Interface Unit (E-70 Brake System)
27/06/2023
35.
IRISET CoE Ltr 20230704 Response to Clarifications sought by WCR
04/07/2023
36.
Letter to CLW with regard to Kavach Drawings 20230706
06/07/2023
37.
Kavach WCR Universal Solution 20230720 to Undue Release of Brake Joint Note WCR CoE Signed
20/07/2023
38.
CoE Ltr 20230724 Kavach Safety Procedure JPO SPAD Prev Other Tests
24/07/2023
39.
CoE IRISET 20230724 Speeds used in Field Trials SPAD Prevention and other Tests
24/07/2023
40.
CoE IRISET Ltr 20230725 Kavach Observations on Medha Loco Simulator at Site for Testing Stn Kavach
25/07/2023
41.
CoE Ltr 20230731 to RDSO Comments Loco TCAS Checklist PCCL
31/07/2023
42.
CoE Ltr 20230108 Kavach Comprehensive Protocol for Loco Trials
31/07/2023
43.
Max. number of Onboard Kavach Units Kavach TCAS CoE RDSO Joint Ltr 20230731
31/07/2023
44.
CoE Ltr 20230731 to OEMs copy RDSO Zonal Rlys - Conflicting Tag Issue
01/08/2023
45.
COE IRISET Ltr 20230803 Standard Drawings for Kavach Fitment WAP7 WAG9 WAP5
03/08/2023
46.
CoE IRISET Ltr 20230806 - Kavach - SPAD Prev Test at WCR Overshoot 130 110 kmph on 20230727
06/08/2023
47.
Kavach TCAS Insp MTJ PWL 20230815 - Insp Note 20230828 by OSD-CoE Lalit Mansukhani
15/08/2023
48.
IRISET COE Letter Kavach fitment in 3ph Locomotives 20230823
23/08/2023
49.
VIDEO on Kavach Prototype Testing in Field through Simulator
50.
VIDEO on Kavach in Auto Sig without Station-to-Station Communication without Block Section RF Tower
51.
Kavach - Joint RDSO CoE Procedure 20230911 - Migration to Ver 4 in Mission Raftaar Section
11/09/2023
52.
IRISET COE Letter E70 Interface Drawing 20230912
12/09/2023
53.
CoE IRISET Ltr 20230920 - Kavach - Improper Braking Logic Parameters
20/09/2023
54.
IRISET Letter to SCR for Comments on 9000HP Interfacing Schematic 20230922
22/09/2023
55.
Letter to CLW for Cable Layout and routing Standardization with Annex 20230925
25/09/2023
56.
Joint Note for Adoption of Knorr Bremse CCB for Kavach 20231004
25/09/2023
57.
CoE Letter to Medha IRAB BIU with Annexures 20231003
03/10/2023
58.
IRISET CoE Ltr to Knorr_bremse wrt to comments on Technical Proposal 20231004
04/10/2023
59.
IRISET CoE Lr.toSCR wrt EMU trial 20231006
06/10/2023
60.
CoE Letter to RDSO for approval of EMU drawings 20231018
18/10/2023
61.
CoE Letter on Analysis of NCR SPAD tests 20231020
18/10/2023
62.
CoE Letter to RDSO installation drawings EMU 20231101
01/11/2023
63.
CoE IRISET Ltr 20231107 Use of 6mm & other size Choke - Case Study Investigation Loco 22592
07/11/2023
64.
Revised CCB 2.0 Test Specification 20231122
22/11/2023
65.
CoE letter sharing Presentation of 26th Nov2023 20231127
27/11/2023
66.
CoE Ltr to Kernex 20231127 undue increase of MA
27/11/2023
67.
CoE Ltr. Use of two tags of same RFID tag set for direction 20231214
14/12/2023
68.
CoE Ltr. Implementation of Health Monitoring and Alerts 20231215
15/12/2023
69.
CoE Ltr. Trial for Braking paramater configuartion in WR and NCR 20231216
16/12/2023
70.
CoE Ltr. Overlapping Communication zone of stationary Kavach units 20231217
17/12/2023
71.
CoE IRISET Ltr 20231218 - Software Logic Issue Resulting in Train Getting linked to Next Signal Uns
18/12/2023
72.
CoE IRISET Ltr 20231218 - Kavach Early Transition to LS mode within 10 Sec
18/12/2023
73.
CoE Kavach Ltr 20231220 to SCR OEMs- Standardization of Pneumatic Cocks Nomenclature
20/12/2023
74.
CoE Kavach Ltr 20231220 - Approval Functionally Different Time Products Different Makes
20/12/2023
75.
CoE Ltr Circulation of Kavach Interfacing E-70 Scheme to OEMs and Zonal Railways 20231226
26/12/2023
76.
CoE IRISET Ltr 20231228 - Kavach Stations with Same Duplicate IDs KMS-1
28/12/2023
77.
CoE IRISET Ltr 20231228 - Undue SoS Conflicting Tag Turnout en-route
28/12/2023
78.
RDSO Approval for conventional MEMU_underslung MEMU and 3 phase MEMU 20231229
29/12/2023
79.
CoE Letter MEMU Kavach Installation Drawings 20231229
29/12/2023
80.
CoE IRISET Ltr 20231231 - Movement Authority MA Approach Locking Section
31/12/2023
81.
CoE IRISET Ltr 20231231 - Option Switching Off Signal Aspect DMI OCIP - Use HR HHR DR Instead of ECR
31/12/2023
82.
CoE Ltr 20240129 - Moving Block Kavach - Auto Traction - Experiment FIeld Concept Trials OEM GG Tronic
29/01/2024
83.
CoE Lr. to RDSO wrt Draft Maintenance Activities of 3PhOnboard Kavach with Annexures 20240131
31/01/2024
84.
kavach-frame offset field in the radio packet structure dated on 31.01.2024
31/01/2024
85.
TSRMS n COA INTEGRATION LETTER TO CRIS 02.02.24
02/02/2024
86.
CoE Ltr 20240204 - Kavach - Mismatch in SIP of Station Block Section Affecting Kavach ToC
04/02/2024
87.
CoE Ltr 20240205 - Kavach - ToC MA - RDSO to issue Modification in Annexure-I Annexure-J in SRS
05/02/2024
88.
Letter to RDSO wrt Roll Away Protection Detection in Conventional EMU with Annexures 20240214
14/02/2024
89.
CoE Ltr to RDSO 20240312 - Reminder to RDSO - Uniform Braking Logic
12/03/2024
90.
CoE Ltr 20240312 to KBIL RDSO - Examination Clarification on Technical Description CCB BIU Doc
12/03/2024
91.
Kavach 20240314 - Solution Analysis Delay in BC Build Up Simultaneous Appl SA9 and A9 in IRAB
14/03/2024
92.
WAG 7 Kavach Installation Drawings with Covering Ltr 20240329
29/03/2024
93.
CoE Ltr 20240104 - Kavach - Proforma for Onboard Startup Procedure
01/04/2024
94.
Arrangement of KAVACH (IRATP) interfacing with CCB 2.0 Brake System in Three Phase Electric Locomotive 20240401
01/04/2024
95.
TSD related to Kavach 01.04.24
01/04/2024
96.
Centralized payment for Royalty charges for DPWCS, Kavach TCAS & VHF
19/04/2024
97.
CoE Ltr 20240425 to PS&EMU RDSO Revision in EMU Dwg (2)
25/04/2024
98.
CoE Ltr 20240425 - WAG 7 drawing Standardization with Annexures
25/04/2024
99.
CoE Ltr 20240425 to RDSO for Standard Electrical Interfacing Schematic CCB 2.0 with Annexures
25/04/2024
100.
CoE Ltr 20240509 - Kavach - Undue relaxation of Permitted Speed
09/05/2024
101.
CoE Ltr Kavach - Improper Implementation of Interfacing Scheme E-70 Brake by HBL 20240523
23/05/2024
102.
CoE Ltr - to Kavach OEMs RDSO wrt Onboard Non-Uniformity Procedure Arrangements Functions 20240524
24/05/2024
103.
CoE - Notes of Onboard Kavach Workshop at CoE-IRISET on 20240605 20240606 with CELEs OEMs RDSO PUs Work
12/06/2024
104.
CoE Ltr 20240618 - Kavach - Vande Bharat VB TCMS Slip Slide Reduced Braking Effort
18/06/2024
105.
v3- MoM Kavach Uniform Braking Algorithm Held at CoE on 20240621
25/06/2024
106.
CoE - Loco Pilot Operating Manual for Kavach Spec Ver 3.2 - for comments
22/07/2024
107.
CoE Ltr 20240917 to RDSO OEMs - Kavach Uniform Braking Algorithm Field Trials
17/09/2024
108.
CoE Ltr 20240918 - Kavach Course Module S&T SNT Technicians Zonal Training School
18/09/2024
109.
CoE Ltr 20240918 - OEM-Specific - Uniform Braking Algorithm Status- Draft Algorithm
18/09/2024
110.
CoE Letter RDSO wrt to E70 and CCB 2.0 Interfacing 20240919
19/09/2024